Q was meant to wake people up. There is no MIL plan to takeover the country and put Trump back in office. Kash and others said that. It's basically a psy op but in a positive way to get normies to think and research. The big accounts pushing Q right now are full of shit. They are told to get anons to 2024 and don't question anything else. So Trump is not coming back until 2024 and if he gets his cabinet correct, he can clean up the mess. The MIL and Intel agencies have too many DS at the top. This is why they can't do anything until Trump back in office. That is the reality.
Fuck what beer at my balls, julians bum, this guy and all those other clowns have to say. The real anons operate in the shadows and not here for fame. Let anons do what they do. the front line warriors are anons and lead the fight.
trump is an OG. No matter what anyone says. This guy is on point like no one ever. he is the fuck around and find out guy. This bitch is one of their pawns. She will go down....wait she has gone down on many...but you know what i mean.
I think consensus is that is what fakery. Regardless, Q already did what he had to do.
It's up to us now to change things. Its we the people making the difference. Stop waiting for a savior. It's not about Trump either. ITS YOU AND ME. The rest of us.
No one is tearing anyone apart or causing division. Gregg is a good dude. He said it and wanted to know what people's thoughts were. We can't always be RAH RAH and this shit can't happen to us....
There are moles everywhere. Curious to who he was alluding to. We need to put our big boy pants on.
I'm not bullshitting. He said it in a truth or an interview. I forgot which and I will find it. I'm sure others heard the same. It had nothing to do with the fraud shit he is dropping. It was an individual who is a traitor and did damage.
- Need a permit from local town clerk. Schematic of plot area where generator will be installed. They need a copy of plot map.
- Need a electrician and plumber (if you are running natural gas pipe).
- Do not install under a deck, near open windows, etc.
- Exhaust should be pointed away from windows or home. Also, make sure it doesn't point to central air unit also. There is new code where the generator exhaust must point away from ac cooling unit. Its in generator install manual. Show the electrician.
- Automatic x-fer switch is a must. Have it installed outside by the electric meter.
- Pour a concrete pad and make sure its level. Have them bolt it down generator to concrete.
- electrician will need access to main electricity panel.
- Propane the way to go.
Going back and worth from here to Pwin huh