It’s 3.5 tcf. That’s on par with the chevron gorgan project or leviathan in the med sea. But they will need to greatly improve the flow rate to make it work. At 21 mmcfd and 650 bopd I can’t see it being profitable at that depth.
They are building a long term infrastructure strategy for the belt and road initiative.
It’s 3.5 tcf. That’s on par with the chevron gorgan project or leviathan in the med sea. But they will need to greatly improve the flow rate to make it work. At 21 mmcfd and 650 bopd I can’t see it being profitable at that depth.
They are building a long term infrastructure strategy for the belt and road initiative.