21 Obama Presidential Library - construction update. Hopefully, the 6th floor will include a jail cell with Barrack and Big Mike placed on exhibition 8-hours per day. It's strange that every other president has at most a 2 or 3 story presidential library... yet Barrack needs a 6-story building? (www.obama.org) posted 1 year ago by Retaining_H2O 1 year ago by Retaining_H2O +21 / -0 Construction Updates You can find the latest updates on the Obama Presidential Center's construction, including road work, local hiring, and more right here. 10 comments share 10 comments share save hide report block hide replies
Doesn’t Clinton have a pool and apartment in his? Read that somewhere a long time ago.
The Obama presidential library should include a 3 story "Gallery of Failures"... a walk through every failed policy of the Obama era.
Obama's "Hall of Victories" could be housed in an over-sized broom closet on the 4th floor.
Don’t forget the “All this for a fucking flag” exhibit.
Maybe they will have a 6 story MOHAP sculpture in the atrium.