Respectfully. Why so much additional draw strength required before installation? They always need new lines and additional voltage strength to install these. Far far more than just “ readability” that is done by my home security system on 2 aa batteries. I am not an electrical engineer so I am super curious. If the only point is to replace the meter readers then an add on would be more efficient and cost effective instead of entire new meters that need triple the transmission lines.
Respectfully. Why so much additional draw strength required before installation? They always need new lines and additional voltage strength to install these. Far far more than just “ readability” that is done by my home security system on 2 aa batteries. I am not an electrical engineer so I am super curious. If the only point is to replace the meter readers then an add on would be more efficient and cost effective instead of entire new meters that need triple the transmission lines.