578 BUSTED: Engineered lumber shortage. (media.gab.com) posted 3 years ago by undine53 3 years ago by undine53 +578 / -0 105 comments share 105 comments share save hide report block hide replies
Business in my town dries lumber before shipping to mill for final sizing. There is literally not any more room on their 10 acre lot and in their buildings for another 2x4. The DS wants to break us with high prices and make us poorer than we were.
That's true. Everyone's kiln is packed with pine, the sawmills are cutting pine, and there's no problem getting pine.
TIL everyone has a kiln except me
Sorry. All the dry kilns in my area.