Red Line.....
(media.greatawakening.win)
You're viewing a single comment thread. View all comments, or full comment thread.
Comments (12)
sorted by:
How the hell does the Q team keep track of all this stuff?
Planning. Think about what it takes to design an entire aircraft or something like a formula 1 car. Every individual piece is bespoke and must be light and functional with no room for failure. The parts are packaged extreme tight, use exotic materials that all need high precision machining. The aerodynamic bits must all work together with high efficiency.
How do we keep track of all of it? Planning.
And control. It's far easier to "keep track" of things when you're responsible for those things, and can safely ignore the disinformation aspects we struggle with.
NCSWIC
Thats very true as well. In engineering we do have a system of control where certain groups or teams have authority over certain decisions that way everything works in the end. They will communicate with any personnel working on auxiliary equipment so everything is cohesive.