I will make this brief as my concern is terrifying. We can build an American Power facility on average in Five Years. We can build a Data Center in Nine Months. The power facility, nuclear on average, can power a state. The Data center on average can demand the power of a state. Do you see the disparity ?
We have seen, the Nashville facility constructed by Tesla or X , appear in 9 months and suppiment itself with diesel generators to 'MASK' the grid demand, and we only heard about complaints of pollution locally.
We also heard about Bill Gates of all people construct his own nuclear power plant in Wyoming years ago. WTF Bill ? FOR WHAT ?
We also heard alot about Chinese investors buying land in strategic locations and banter about what it was used for. . .
Well friends, they are strategic locations for blocking the planting of food and the positioning of would be power plants.
This is not a fantasy, a joke or a political election year talking point.
For example a 380 acre rural farm is being zoned from rural to industrial in North Carolina. Ordinarily this would be farm land to grow food, being fought over to build housing. Not today, that would only yield perhaps a max of $500 million in pure profit. No, we are looking at $38 billion dolars in profit for a DATA CENTER.
This Data Center will demand 30% of North Carolinas Energy. It will be designated a "Utility" Therefore being given precident overy humans. In other words Gramma won't have heat this winter. . . Sorry. Politicians will have lined their pockets to the largest profits in history. AUDIT THEM MF'ERS.
This is America now, and MAGA supports it from the Boss Down. Trumpster said we want to have A.I. Dominance. At what price, for what outcome ?...
This in my opinion is failed policy and piss poor planning in the face of JOHN TRUMP.
TESLA and JOHN TRUMP had free energy plans and knew how to impliment it.
YOU WANT TO ROCK AND ROLL TRUMP. . .
FREE ENERGY FOR ALL, NOW, while you develop A.I.
Otherwise China has already won the war.
They have the lead in power, already established and A.I. , end of story.
Hate to put it on the plate like that friends, but timing is of the essence and we blinked and we let a FOUR YEAR ELECTION dictate our fate.
FOUR YEARS , AS YOU ARE NOW LEARNING IS LIKE FOUR MILLENIUM.
AI datacenters consume a lot of water. Like, a LOT of water. It's not good for the environment and it's not good for nearby cities who see their energy prices doubling or tripling due to increased demands on the grid.
This AI obsession has some sinister and dangerous underpinnings which Trump hasn't addressed.
Yes Friend, Cooling the data centers is mandatory. They are logistically located near natural water supplies or near massive public utility availability, again where they can get "utility" status and take prescident over humans. I absolutely missed this point I was so internally upset to be honest. I even made alot of spelling mistakes and such. This is the most dire scenario I have every faced personally. I am not alone here, many soon will feel this rush of disbelief. Brace yourselves ! Stay strong and I thank God for all the brothers and sisters in this with us.
Try telling that to Texans screaming bloody murder about the monstrosity of a data center going up in Abilene, TX with their utility bills already skyrocketing. There's a little isolated lake nearby the site, there but no actual flowing waterways to feed that colossal place anywhere around. Local residents have already been put under water usage restrictions and the site isn't even fully up and running yet - it's a year away from being fully built.
The drain on TX's already fragile power grid (especially during insane, prolonged heat waves in the summer) is going to be massive and Texans all over the state will be impacted with higher electric bills and rationing of resources because of it. I'm totally pissed about it already.
This is probably a good time to consider solar panels. My friend took advantage of the Government rebate program, installed on his roof with battery back up and is now selling power back to the grid. His savings pay for the loan he took out for the balance, the rest he invests weekly in other areas to suppliment further. Win win for his purposes and exempt from increases, outages and restrictions.
So you are saying Greenland Cooling System and New power technology has just changed the calculations ?
It could take some impact off the public financially, however , the end game is stealing our data for sale and propogation to fuel further A.I. development IE, SKYNET, the downfall of man via robots. So we have to manage machines better. The inherent problem is man cannot govern man, and in us leaning on building, essentially a 'better man/robot' we get it at hyperspeed or exponential development.
Evil always has but one end game. It all started with a snake.
"Neither shall men say, Lo here, or lo there: for behold, the kingdom of God is within you." Luke 17:21
I promise you the very first week grandma doesn’t have electricity and the DATA CENTER™️ does — drastic things will happen.
I wouldn’t worry too much about it.
They need to & right now release every energy innovation that's known. Get out those patents that are suppressed. I'm concerned about so many Data Centers; how many do we really need & what are really being created for. We need to concentrate on the energy we'll need for new & present industry & people's needs. A lot more could be said, but I'll stop there.
100% the data itself is the richest commodity in the world currently, thats the frenzy aside from machine learning dominance. You got it.
Build them on tthe north slope of alaska,their is almost unlimited amounts of natural gas.
This is the answer, most power losses happen in transmission. Free cooling up there too.
Actually, no. Transmission has high efficiency. The major inefficiency is converting heat to electric power. There are some efficiency losses in voltage transforming, up and down.
For freedom of humanity. He who controlled the most powerful AI will control the world.
https://fractalcomputing.substack.com/p/how-walmart-leapfrogs-amazon-with
Mebbe not
Will AI lead to 10 days of darkness?
It absolutely can. At the rate we are at now expect this crisis before Christmas. If you were to plot them out on a map, planned and approved, considering a 9 month cycle from application to implimentation its shocking. They kicker is that a politician has never been presented with a kick back this large. They cannot refuse.
The best example is in North Carolina. Dale Earnhardt has a 400 acre ranch that his widow inherited. The land is worth $40 million dollars in profit for housing if she sells. However, she is looking to get it zoned industrial to sell to a big tech company for a data center for $40 billion. Vastly different scale. The facility will immediately cause a 30-40% deficit on the state.
Data itself is so valuable of a commodity, its an exponential increase in every metric. Its insane. More valuable than gold, platinum, humans, adrenachrome, you name it. Evil has gone next level friends.
So by your own admission China already has the lead. So what exactly would giving them access to Free Energy do but further reinforce their lead? Because implement it here. It functionally is implemented everywhere.
And Gates didn’t build a Nuclear Plant. Licensing was started to give Microsoft the ability to build one.
And even still. We don’t have the infrastructure in place. Any plans Tesla had were based off the America of the early twentieth century. Where large parts of the country lived without electricity. And infrastructure often stopped at city limits. Almost all of our infrastructure, appliances, and other conveniences is predicated on receiving power from lines. They aren’t capable of functioning otherwise.
Any switch over is going to either be the work of years. Or require replacing everyone’s shit free of cost.
China having the lead is just a basis in current metrix. That is a product of the Presidents comparison. I have no issue with the world getting free energy all at once, that lever of control being lifted is worth any political drawback. The Gates plant is separate from Microsoft the company is called TerraPower and broke ground a year ago.
Your accurate regarding our inability to process free energy at this time. However, the notion and demand would create many jobs to convert. The revenue from taxes alone could pay for any conversions as all the energy revenue would fold back into the economy directly. Power lines are two fold, they loose 50% during transmission , by design, and they already are probably receiving energy, free energy by design as well. So your energy company is 50% more profitable than every reported, by design. Remember they engineered the program to have a meter, ripping free energy from the masses in an evil leverage.
Humans are not expected to stand, at all. In fact, FEMA internal documents expect less than one percent, and so far its been less. They just do what they want and we eat Cheetohs and watch Netflix.
Not even close. The power generation process from heat source to generated electricity is about 35% efficient. The transmission and distribution process is about 98-92% efficient in transmission and 96% efficient in distribution. This is why power networks exist, because it is more efficient to have large central powerplants with wide transmission/distribution systems. More discussion: https://insideenergy.org/2015/11/06/lost-in-transmission-how-much-electricity-disappears-between-a-power-plant-and-your-plug/
Don't hold your breath waiting for "free energy." It doesn't exist. Tesla was wrong on this point.
Thanks for the clarification and the link too. Hopefully, this can be dealt with in a timely manor !